About this property
The cost of finishing an apartment after handover is the number most off-plan buyers forget to budget for. Tiling, kitchen appliances, bathroom fixtures, paint, wardrobes — in a 1,387 sq ft 2-bedroom, that bill can easily reach AED 80,000-120,000 depending on the specification you want. MAG 777 eliminates that line item entirely.
Unit 207 is delivered to a move-in standard that most developers in this price range do not match. Full wall cladding throughout — not just the wet areas, everywhere. Teka kitchen appliances pre-installed: oven, hob, extractor hood, and a washing machine. Three bathrooms, each finished to the same standard as the rest of the unit. You collect your keys and the apartment is ready. No contractors, no sourcing, no three-month delay between handover and habitability.
The layout gives you 1,387 sq ft of usable space across two bedrooms with a balcony facing the community. The proportions are practical: bedrooms that fit proper furniture, a living area that does not force you to choose between a dining table and a sofa, and a kitchen that functions as a kitchen — not a decorative strip with a single burner.
This matters whether you are living here or renting. Tenants in Dubai Sports City increasingly compare finishes across listings. A fully fitted unit with consistent material quality photographs better, lets faster, and commands stronger rent than a shell that was finished on a budget after the fact.
The building is approximately 70% complete, scheduled for Q3 2026 handover. The 20/80 payment structure — deposit now, balance at completion — is aligned for mortgage buyers. At AED 1,883,000 for a fully finished 2-bed with 3 bathrooms, the total cost of ownership is transparent from day one.
Request the detailed specification sheet, floor plan, and payment schedule.